WEICHAI WP6G160E201 DHB06G0220

Product Description

Diesel Engine Main Technical Parameters

Table 1-1 Main Technical Parameters of first-generation WP6 mechanical pump series diesel engine

Items

Unit

Type

Engine model

WP6 mechanical pump series diesel engine

125

140

160

175

Engine type

4-stroke, water-cooling, in-line, direct injection,

wet-type cylinder sleeve, high speed diesel engine

Intake pattern

Turbocharged

Displacement

L

6.75

Cylinder diameter×Stroke

mm

105×130

Number of cylinders

6

Number of air valves for each cylinder

2

Compression ratio

18:1

Ignition order

1-5-3-6-2-4

Fuel injection equipment

Mechanical pump

Rated power

kW

92

105

118

129

Rated speed

r/min

2200

2200

2000

2200

Maximum torque

Nm

540

560

640

680

Speed at maximum torque

r/min

1300~ 1600

Emission standard

China stage II

Fuel consumption at rated power

g/kilom

≤250

Minimum fuel consumption under full load

g/kilom

≤215

Cold start—without aid

-10

Cold start—with aid

-30

Noise at 1m

dB

<117

B10 service life

km

500,000

Unseal of Diesel engine

After opened the engine packing container, the user should firstly check the engine and its accessories according to the packing list, check whether engine appearance is damaged and whether connections are loose, and then perform the following work:

(1) Wipe up the antirust coat and anticorrosive agent on exposed surface of the engine.

(2) Drain seal fuel in fuel filter and parts of fuel system out (It’s also allowed to start the engine without draining seal fuel in fuel system, but only can the engine be loaded after all seal fuel are consumed and normal diesel fuel is supplied in place). The users also need to pay attention to that storage life for diesel engine before unpacking is one year, for new diesel engine that has been stored for more than one year should be inspected and taken additional measures:

l Rotate the flywheel and spray solvent into engine intake tube, until all seal fuel in cylinders is expelled.

l Spray solvent into turbocharger intake and exhaust vent, until all seal fuel there is expelled.

l According to the service agreement with customer, we are obliged to add specified engine oil to engine without oil in oil sump; while for engine that has been filled with engine oil (with running-in accelerant) before being delivered, we suggest you replace the engine oil after run-in period (2000km or 50h).

l According to the service agreement with customer, for engine that has been filled with coolant before delivery under customer’s requirements, the coolant performance should be checked after unpacking, if the coolant is subjected to -30℃ or -35℃, its PH should be 7~8 (neutral) and hardness value should be 5~15°d [9~ 15°f (hardness)], otherwise, drain the old coolant and out and refill coolant with antifreeze additive.

(3) Check whether water blockage and grease blockage are unobstructed, check whether water temperature sensor and oil temperature sensor are in readiness.

NOTICE: Never start an engine before it is correctly installed and properly connected. When running the engine in enclosed environment, maintain good ventilation to ensure exhaust gas emissions into the atmosphere.